CLIQ™ Launches Modular Lighting System Designed for Faster, Lower-Cost Data Center Construction

Innovative CLIQ system removes lighting as a construction bottleneck by dramatically reducing labor time and operating energy in large-scale facilities

DENVER, CO, UNITED STATES, January 15, 2026 /EINPresswire.com/ — CLIQ™, a new modular lighting system developed by SHIFT Innovations, the innovation engine of 1LUX, today announced the launch of a radically simplified lighting solution designed to address one of the most persistent and overlooked challenges in modern construction: slow, labor-intensive lighting installation that hasn’t evolved in decades.

As data centers and other large-scale facilities race to come online amid skilled labor shortages, rising construction costs, and aggressive delivery schedules, CLIQ replaces traditional lighting methods with a system engineered for speed, efficiency, and self-performed installation—reducing reliance on scarce skilled labor and complex wiring.

“Material and labor costs may vary, but time pressure is constant,” said Brian Stern, CEO at 1LUX. “CLIQ was built around that reality. We designed this system to remove lighting as a bottleneck so projects can move faster, crews can work more efficiently, and facilities can operate with lower ongoing energy costs once they go online.”

Traditional lighting systems can require thousands of labor hours per data center, often involving multiple installation phases and expensive skilled labor. CLIQ’s modular, Class 2 low-voltage design installs up to ten times faster than legacy systems and transitions seamlessly from temporary to permanent lighting—eliminating redundant work and significantly compressing construction timelines.

Beyond installation speed, CLIQ reduces long-term energy consumption, helping continuously operating facilities like data centers better control operating costs. The system also simplifies logistics and reduces packaging and job-site waste, improving safety, cleanliness, and overall site efficiency.

CLIQ was developed by lighting and construction veterans with decades of hands-on experience designing, selling, and installing systems across large-scale projects. That real-world perspective shaped a product focused less on adding features—and more on eliminating construction issues in large spaces like data centers.

“The latest construction methods demand the latest, most innovative construction solutions. CLIQ Modular Lighting helps contractors and developers build smarter where speed, labor availability, and energy efficiency define success,” Stern added. “CLIQ isn’t about reinventing lighting for the sake of it. It’s about building smarter for an era where speed, labor availability, and energy efficiency define success.”

While CLIQ was designed to address the acute challenges facing data center construction, the system is also well suited for other large-scale environments including warehouses, manufacturing facilities, public storage, and large-format commercial spaces.

For more information about CLIQ, visit CLIQLighting.com.


About 1LUX

1LUX is a Denver-based lighting company delivering unexpected ingenuity across a wide range of lighting products, logistics, and project solutions. With deep roots in design, distribution, and execution, 1LUX brings together innovative products, operational efficiency, and real-world expertise to solve complex challenges across large-scale commercial, industrial, and infrastructure environments. Through its portfolio of brands and services, 1LUX focuses on simplifying systems, reducing friction, and creating measurable value for clients at every stage of a project.

About SHIFT Innovations

SHIFT Innovations is the problem-solving and product incubation division of 1LUX. Driven by design thinking and hands-on industry experience, SHIFT identifies inefficiencies that have become accepted as “the way things are” and develops new solutions that rethink how lighting and construction systems should work. SHIFT is the creative engine behind CLIQ™ Modular Lighting System and future innovations across the 1LUX portfolio.

Kate Stuard
1LUX
kate@dsjstrat.com

Legal Disclaimer:

EIN Presswire provides this news content “as is” without warranty of any kind. We do not accept any responsibility or liability
for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this
article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Information contained on this page is provided by an independent third-party content provider. XPRMedia and this Site make no warranties or representations in connection therewith. If you are affiliated with this page and would like it removed please contact pressreleases@xpr.media

Metos NA and Turflogic Announce Strategic Partnership to Deliver Transformational Insights for Golf Course Management

Metos NA and Turflogic Announce Strategic Partnership to Deliver Transformational Insights for Golf Course Management

BONITA SPRINGS, FL, UNITED STATES, January 16, 2026 /EINPresswire.com/ — Metos NA, a subsidiary of Pessl Instruments,

January 25, 2026

Looper Insights Introduces Advanced Content Type & Genre Filtering to Its Merchandising Platform

Looper Insights Introduces Advanced Content Type & Genre Filtering to Its Merchandising Platform

LONDON, UNITED KINGDOM, January 16, 2026 /EINPresswire.com/ — Looper Insights, the leading CTV merchandising analytics

January 25, 2026

Dubai Claims Its Place as The Global Food Capital as Homegrown Chefs Take Centre Stage at Dubai World Cuisine By Gulfood

Dubai Claims Its Place as The Global Food Capital as Homegrown Chefs Take Centre Stage at Dubai World Cuisine By Gulfood

The world takes a seat at Dubai’s table as homegrown and globally acclaimed chefs redefine Dubai’s culinary identity as

January 25, 2026

Semper Velocity Management Accelerates Growth with 2025 Florida Relocation and Lumen Fiber+ Campaign

Semper Velocity Management Accelerates Growth with 2025 Florida Relocation and Lumen Fiber+ Campaign

Semper Velocity Management relocates to Florida, driving rapid growth and success with its Lumen Fiber+ campaign and

January 25, 2026

DreamFi and Ben Crump Law Announce Community-Focused Partnership with National Baptist Convention USA, Inc.

DreamFi and Ben Crump Law Announce Community-Focused Partnership with National Baptist Convention USA, Inc.

The partnership reflects a shared commitment to strengthening communities through financial education, stewardship, and

January 25, 2026

CRSTL Radio to Launch Feb 1, 2026 from Lindenwood Park Place Social Club

CRSTL Radio to Launch Feb 1, 2026 from Lindenwood Park Place Social Club

CRSTL, a volunteer-run internet radio station founded by former KDHX DJs, launches from Lindenwood Park Place, a

January 25, 2026

HiBFF Announces Launch of V2.0 AI Companionship Platform with Integrated Ethical Safety Architecture

HiBFF Announces Launch of V2.0 AI Companionship Platform with Integrated Ethical Safety Architecture

HiBFF announced the deployment of HiBFF V2.0, an artificial intelligence companionship platform developed to address

January 25, 2026

Polygon Research Expands Loan-Level Non-QM Market Analysis in HMDAVision®

Polygon Research Expands Loan-Level Non-QM Market Analysis in HMDAVision®

The January 2026 update enables examination of Non-Qualified Mortgage activity at the loan level across seven years of

January 25, 2026

Suberu Luxury Launches Exclusive Strategic Seller Consultation to Help Boston’s Suburban Luxury Sellers Prepare for 2026

Suberu Luxury Launches Exclusive Strategic Seller Consultation to Help Boston’s Suburban Luxury Sellers Prepare for 2026

New consultation focuses on pricing, timing, digital strategy, and market positioning for 2026 home sales Luxury

January 25, 2026

Hangar A Named Overall Winner Among Innovative Organizations at the 2026 BIG Innovation Awards

Hangar A Named Overall Winner Among Innovative Organizations at the 2026 BIG Innovation Awards

Recognized for redefining express logistics through automation and end-to-end delivery visibility. We set out to

January 25, 2026

The European Announces Its 2025 Award Winners

The European Announces Its 2025 Award Winners

LONDON, UNITED KINGDOM, January 16, 2026 /EINPresswire.com/ — The European continues with its annual recognition of

January 25, 2026

From Tool to Ecosystem: Ecer.com Reshapes the Next Generation of Cross-Border B2B Platforms with AI

From Tool to Ecosystem: Ecer.com Reshapes the Next Generation of Cross-Border B2B Platforms with AI

BEIJING, CHINA, CHINA, January 16, 2026 /EINPresswire.com/ — Cross-border trade has always faced challenges such as

January 25, 2026

Smartech Broadens Telecommunications Services Across the Midwest Region

Smartech Broadens Telecommunications Services Across the Midwest Region

Smartech LLC has announced the expansion of its telecommunications service coverage across multiple states in the

January 25, 2026

Vermont Bill Establishes Statewide Task Force to Scientifically Evaluate Unidentified Aerial Activity

Vermont Bill Establishes Statewide Task Force to Scientifically Evaluate Unidentified Aerial Activity

The bill assigns responsibility for the scientific analysis of reported aerial activity to the Scientific Coalition for

January 25, 2026

St. Joseph’s, a Villa Center, Earns CMS 5-Star Overall Rating

St. Joseph’s, a Villa Center, Earns CMS 5-Star Overall Rating

Recognized as a 5-Star provider, St. Joseph’s, a Villa Center, earned top marks from CMS for inspections, staffing, and

January 25, 2026

PJI Law, PLC Strengthens Civil Litigation Practice with Four New Attorneys, Positioning Firm for Continued Growth in ’26

PJI Law, PLC Strengthens Civil Litigation Practice with Four New Attorneys, Positioning Firm for Continued Growth in ’26

PJI Law adds four attorneys to its Civil Litigation team, expanding expertise across complex disputes and supporting

January 25, 2026

Former Amazon Robotics Engineer Advises Physical AI Companies on Functional Safety as Systems Scale

Former Amazon Robotics Engineer Advises Physical AI Companies on Functional Safety as Systems Scale

Safety practitioner works with startups and research programs as robotics move into real-world environments ATLANTA ,

January 25, 2026

World’s first 5MW Coolant Distribution Unit is now operational in data centers in Europe and The United States

World’s first 5MW Coolant Distribution Unit is now operational in data centers in Europe and The United States

The Facility Distribution Unit (FDU) is a 5-megawatt liquid cooling system, engineered to serve entire data halls. It

January 25, 2026

Korea Lighting Unveils Light Therapy–Based Brain Health Management Solution ‘Neurélux’ at CES 2026

Korea Lighting Unveils Light Therapy–Based Brain Health Management Solution ‘Neurélux’ at CES 2026

Introducing an Ambient Care Experience Integrated into Daily Life LAS VEGAS, NV, UNITED STATES, January 16, 2026

January 25, 2026

Ecoldbrew Wins Best of CES, Serving Cold Brew Coffee in Just 5 Minutes

Ecoldbrew Wins Best of CES, Serving Cold Brew Coffee in Just 5 Minutes

Award-winning Ecoldbrew delivers smooth, freshly ground cold brew in five minutes, compatible with popular 40oz travel

January 25, 2026

Able Channel and Beacon International Announce Strategic Partnership

Able Channel and Beacon International Announce Strategic Partnership

Able Channel and Beacon International Announce Partnership to Deliver Business Insurance Content via Streaming –

January 25, 2026

MIRUD Releases ‘Entre Os Mundos’ Portuguese Album

MIRUD Releases ‘Entre Os Mundos’ Portuguese Album

LOS ANGELES, CA, UNITED STATES, October 28, 2025 /EINPresswire.com/ — Recording artist MIRUD has released "Entre Os

January 25, 2026

MIRUD Emerges As a Viral Star in Latin America with the Release of Dios Me Lo Quitó

MIRUD Emerges As a Viral Star in Latin America with the Release of Dios Me Lo Quitó

LA NACIóN, VENEZUELA, November 2, 2025 /EINPresswire.com/ — Following the success of his Portuguese album Entre os

January 25, 2026

Regional Collaboration Aims to Empower Youth and Faith-Based Initiatives in Kentucky and Indiana

Regional Collaboration Aims to Empower Youth and Faith-Based Initiatives in Kentucky and Indiana

Addison Ministries and Luminary Comity unite to expand civic engagement, outreach, and leadership training in

January 25, 2026

OmniWatch Analysis Finds Identity Theft Rates At All-Time High, According To New FTC Data

OmniWatch Analysis Finds Identity Theft Rates At All-Time High, According To New FTC Data

Identity theft reports surpassed 2024 totals within the first nine months of 2025, as scam-driven fraud losses climbed

January 25, 2026

AI and network science for emotional risk measurement in stock markets

AI and network science for emotional risk measurement in stock markets

GA, UNITED STATES, January 16, 2026 /EINPresswire.com/ — Researchers introduce a new asset pricing factor called

January 25, 2026

Michigan-Based Dustout Air Duct Cleaning Highlights Critical Need for Professional Duct Sealing as Energy Costs Rise

Michigan-Based Dustout Air Duct Cleaning Highlights Critical Need for Professional Duct Sealing as Energy Costs Rise

MI, UNITED STATES, January 16, 2026 /EINPresswire.com/ — As Michigan homeowners face another winter of escalating

January 25, 2026

Editorial Feature Highlights Sunil Kanojiya’s Background in Analytics and Project Coordination

Editorial Feature Highlights Sunil Kanojiya’s Background in Analytics and Project Coordination

A newly released feature article presents an overview of Sunil Kanojiya’s professional experience in

January 25, 2026

Feature Article Examines AI Use in Modern Network Security

Feature Article Examines AI Use in Modern Network Security

A newly published feature article authored by Yogesh Sharad Ahirrao discusses the application of AI-driven security

January 25, 2026

The ‘GENERAL’ Custom Flat Fender Vehicle Heads to Barrett-Jackson in Scottsdale

The ‘GENERAL’ Custom Flat Fender Vehicle Heads to Barrett-Jackson in Scottsdale

These ground-up custom vehicles pay tribute to the iconic flat-fender Jeep® and are now available to order (limited)

January 25, 2026

New AI-Based Healthcare Platform Set for Global Launch in 2026

New AI-Based Healthcare Platform Set for Global Launch in 2026

EDINBURGH, UNITED KINGDOM, January 16, 2026 /EINPresswire.com/ — A new artificial intelligence–based healthcare

January 25, 2026

NordEst Saunas Launches in the U.S., Bringing Authentic Estonian Sauna Culture to American Backyards

NordEst Saunas Launches in the U.S., Bringing Authentic Estonian Sauna Culture to American Backyards

Following the Success of BZB Cabins & Outdoors, Sigmar Sikk's New Venture Combines 12 Years of U.S. Market

January 25, 2026

New Home Loans Hub Launches to Help Government Employees Access Grants, Down Payment Assistance, Specialized Mortgages

New Home Loans Hub Launches to Help Government Employees Access Grants, Down Payment Assistance, Specialized Mortgages

Next Door Programs® Introduces “Home Loans for Government Employees” With Access to Up to $33,000 in Housing Assistance

January 25, 2026

O3 Solutions Introduces Otto, a Personal AI Assistant for Capital Project Teams

O3 Solutions Introduces Otto, a Personal AI Assistant for Capital Project Teams

New AI capability brings real-time insight, analysis, and AWP guidance directly into project workflows. BIRMINGHAM, AL,

January 25, 2026

UAGC Faculty Voice Featured in Harvard-Led Global Conversation on AI and the Future of Education

UAGC Faculty Voice Featured in Harvard-Led Global Conversation on AI and the Future of Education

In higher education, the return on investment is not speed or efficiency. It’s wisdom, empathy, and the ability to

January 25, 2026

Vera Appoints Global Health Leader Vera Zlidar to Its Board of Advisors

Vera Appoints Global Health Leader Vera Zlidar to Its Board of Advisors

It’s deeply meaningful to join a company that carries my name and reflects the values I’ve devoted my career to.”— Vera

January 25, 2026

Charlie Cruz unveils ‘Ella No Tiene La Culpa’, marking a bold new chapter in his artistic journey

Charlie Cruz unveils ‘Ella No Tiene La Culpa’, marking a bold new chapter in his artistic journey

Charlie Cruz releases “Ella No Tiene La Culpa,” marking a new artistic chapter with a renewed sound, elite production,

January 25, 2026

64% of Remote Workers Value Flexibility Over Pay, New Survey Finds

64% of Remote Workers Value Flexibility Over Pay, New Survey Finds

VANCOUVER , VANCOUVER, CANADA, January 16, 2026 /EINPresswire.com/ — A new global survey of remote professionals

January 25, 2026

Vai Dai Coffee+ Signs NIL Deals with Athletes Bella Mir & Steph Yakoff

Vai Dai Coffee+ Signs NIL Deals with Athletes Bella Mir & Steph Yakoff

Vai Dai Coffee+ partners with Bella Mir, UFC's first NIL ambassador & Iowa wrestling standout, plus tennis phenom

January 25, 2026

TICKETS ON SALE FRIDAY, JANUARY 16TH AT 10 A.M. FOR THE 2026 MEMPHIS IN MAY WORLD CHAMPIONSHIP BARBECUE COOKING CONTEST

TICKETS ON SALE FRIDAY, JANUARY 16TH AT 10 A.M. FOR THE 2026 MEMPHIS IN MAY WORLD CHAMPIONSHIP BARBECUE COOKING CONTEST

The World Championship Barbecue Cooking Contest is a signature experience for barbecue fans everywhere, We can’t wait

January 25, 2026